Notice of Move-in, Rig-Up
Crestone Peak Resources has notified the COGCC that they will perform Move-in, Rig Up operations on the Woolley 22-7
well located within Erie limits (north of CR 10.5 and east of County Line Road).Crestone reports the Work-Over Rig operations will begin on June 7 and is expected to last 1 day.
What is this operation?Gas well move in, rig ups, drilling rig, and work-over rig is performed to place, and/or assemble parts of the oil rig equipment, and prepare for drilling.
A 'Rig Workover', as defined by the Colorado Oil and Gas Conservation Commission is "Remedial work to the equipment within a well, the well pipework, or relating to attempts to increase the rate of flow."
A 'Drilling Rig', as defined by Colorado Oil and Gas Conservation Commission is "a drilling unit that is not permanently fixed to the seabed, e.g. a drillship, a semi-submersible or a jack-up unit. Also means the derrick and its associated machinery."