Oil & Gas Notifications

Notice of Move In - Rig Up

Texas TEA of Colorado LLC has notified the COGCC that they will perform Move-in, Rig Up operations on the Nelson site located outside Erie limits (north of Hwy 52 and west of CR5).

According to Texas TEA of Colorado, the operations will begin on May 3, 2021 and is expected to last 7 days.

What is this operation?
Gas well move in, rig ups, drilling rig, and work-over rig is performed to place, and/or assemble parts of the oil rig equipment, and prepare for drilling.

A 'Rig Workover', as defined by the Colorado Oil and Gas Conservation Commission is "Remedial work to the equipment within a well, the well pipework, or relating to attempts to increase the rate of flow."

A 'Drilling Rig', as defined by Colorado Oil and Gas Conservation Commission is "a drilling unit that is not permanently fixed to the seabed, e.g. a drillship, a semi-submersible or a jack-up unit. Also means the derrick and its associated machinery."

More:
Visit the Town of Erie interactive Oil and Gas Sites map (most compatible on a desktop)
Questions and comments can be sent to erieoilandgas@erieco.gov
View archive of Oil and Gas notifications
Notice of Rig Up - Nelson

More:
Visit the Town of Erie interactive Oil and Gas Sites map (most compatible on desktop)
Questions and comments can be sent to erieoilandgas@erieco.gov
View archive of Oil and Gas notifications

Share on Facebook
Share on Twitter
Share via Email

Copyright © 2021 Town of Erie. All Rights Reserved.
645 Holbrook Street, Erie, CO 80516

Powered by
CivicSend - A product of CivicPlus