Notice of Move-in, Rig-Up
Kerr McGee Oil and Gas has notified the COGCC that they will perform Move-in, Rig Up operations on the Mjolnir site located outside of Erie limits (east of CR 7 and north of CR12).Mjolnir siteKerr McGee reports the Work-Over Rig operations will begin on March 8 at 7 a.m. and is expected to last about 4 days.
What is this operation?Gas well move in, rig up's, drilling rig, and work-over rig is performed to place, and/or assemble parts of the oil rig equipment, and prepare for drilling.
A 'Rig Workover', as defined by the Colorado Oil and Gas Conservation Commission is "Remedial work to the equipment within a well, the well pipework, or relating to attempts to increase the rate of flow."
A 'Drilling Rig', as defined by Colorado Oil and Gas Conservation Commission is "a drilling unit that is not permanently fixed to the seabed, e.g. a drillship, a semi-submersible or a jack-up unit. Also means the derrick and its associated machinery."
More:Contact Kerr McGee at 720-929-6000Visit the Town of Erie interactive Oil and Gas Sites map (most compatible on a desktop)Questions and comments can be sent to erieoilandgas@erieco.govView archive of Oil and Gas notifications